Questions or Concerns about projects can be directed to Joe Langeberg at 608-786-3813 or [email protected], unless otherwise stated in the project description.

LAPC 2024-2027 Transportation Improvement Program

Follow the link to the La Crosse Area Planning Committe to view the transportation improvement program map.

https://arcg.is/1WDuTT1

 2025 Projects

STH 162 Wis DOT Project.  Coon Valley to Bangor.  Project Engineer: Timothy Reichgelt, [email protected], 608-385-2119

STH 162 red

STH 16 Wis DOT Projects.  Three individual projects all in 2025: Bridge, Intersection, and resurfacing.  Documents attached.  If you have any questions concerning these projects please contact Mike Novey (608) 334-5215, [email protected].

Project Contacts

16 project_emerg-project-contacts

Bridge (over the La Crosse River)

16 Bridge plan red

Intersection  (Gillette Street and STH 16)

16 Intersection Plan red

Resurfacing (From La Crosse Street north to bridge over the La Crosse River and after bridge north to STH 157)

16 overlay plan red

CTH M North & South (CTH W to CTH D and STH 14 to STH 33).  Estimated Construction Year 2025.  Culvert (Small structure) repalacements.  Documents attached.

CTH FO (CTH F to CTH OA).  Widening Shoulders Project.  Estimated construction year 2025.

FO draft plans

CTH XX Design.  Projected for construction in 2025.  Proposed reconstruction and realignment of the CTH XX/CTH OT intersection reconstruct CTH XX through New Amsterdam. 

CTH G Bridge Replacement. Coon Creek Bridge B-32-0250 (between CTH P - CTH H).

PUBLIC INVOLVEMENT MEETING.  The La Crosse County Highway Department will be holding a Public Involvement Meeting for the above bridge replacement project on Tuesday, June 17, 2025 from 5:00-6:00 p.m. The meeting will take place in the St. Joseph County Shop, W3249 State Highway 33, La Crosse, WI 54601. The meeting will be an “open-house” format with a short presentation provided at 5pm.   Below is a project location map showing the location of the bridge replacement project. If you have questions or require additional information, please feel free to contact Julia Zehner at 608-355-8878 or [email protected].  

CTH G - PROJECT LOCATION MAP

B-32-0250_rod - RED

B-32-0250_pln

CTH JB Reconditioning.

CTH NN Reconstruction.

CTH M Bostwick Creek Bridge Replacement. Town of Barre.  Estimated construction year is 2026.  Proposed work includes bridge replacement.  

54360077_pln_60 Reduced CTH M Bostwick Creek Bridge

    CTH OT Design.  Estimated construction year is 2026. Proposed roundabout at the intersection of County Rd OT and Commerce Rd/Corporate Dr.  This project is in the preliminary design stages.

    CTH YY Reconditioning.

    2027 Projects

    CTH M Pavement Replacement.  West Salem to CTH W

    WISLHR map CTH M

    CTH M Bridge Replacement.  Bridge at CTH M and CTH T.

    CTH M bridge at T

    CTH T Overlay & Upgrade.  CTH EE to STH 162.

    WISLR CTH T (EE-162)

    Future Projects

    CTH M Construction Project & Bostwick Creek Bridge. From CTH O to CTH I, in the Town of Barre. Proposed work includes bridge replacement, roadway grading and widening, paving, and culvert and drainage work. 

    Please contact Ross Johnson, CBS Squared, Inc., by phone at  (715) 861-2236, or email at [email protected] for project information.

    CTH MH Resurfacing.  Preliminary plans for CTH MH in Holmen.  Work is planned for 2028.

    59910812_Project Location Map CTH MH

    59910812_Prelim. Plan for utilities CTH MH

    On-Going Maintenance Projects

    WisDOT Projects.  Follow these links for information on Wisconsin Department of Transportation (WIDOT) projects in La Crosse County.  

    USH 53 Project